Primavera P6 Tutorial Cost Loading

03.01.2020by admin
Primavera P6 Tutorial Cost Loading Rating: 7,7/10 472 reviews
  1. Primavera Tutorial
  2. Primavera P6 Cost Management
  3. Recalculate Assignment Costs In P6
Loading

Video: Using WBS Summary & Level of Effort for Cost Loading in Primavera P6Do you remember this slide from the course intro video? We had two types of estimating, the bottom up estimating and then top down estimating and or planning. Well, in the last video we saw bottom up planning techniques in Primavera P6.

Primavera Tutorial

Primavera P6 Tutorial Cost Loading

Primavera P6 Cost Management

In this video, I will show you some of those techniques that can be applied to do top down estimating or top down planning. Now these techniques are nothing new but they rely on special activity types built into Primavera the WBS summary activity type or the love of level type and these techniques are the same techniques that we use in resourcing as well using those special activity types. So let’s dive in a P6 and see what happens.Okay, let’s get started looking at some of these top down planning methods for cost loading our schedule in P6. Now the quick review, the way P6 works we are only allowed to assign costs or resources to activities but in top down planning, we want to be able to assign costs and resources to higher level WBS elements. Unfortunately, P6 doesn’t let us sign cost to WBS elements. On the screen the WBS elements are just the groups and sort bars. They are not really constructs and we are not allowed to assign anything to those bars.

Recalculate Assignment Costs In P6

So what we need to do is we need to work with some special activity types in order to mimi.